  BL26B2 closed
Date: 2023-09-06 (Wed)
BL26B2 has finished operation as PX-BL as of 2023A.
All users are appreciated for their scientific use and outputs.

  BL26B2 detector
Date: 2021-02-15 (Mon)
Area detector at BL26B2 has been replaced to MX225HS after reparing the power soure problem.

  Notice! BL26B2 detector
Date: 2020-10-10 (Sat)
MX225HS is out of use, because of an electrical circuit error.
We have contacted the manufacturer to fix the problem.
MX225HE is alternatively installed for user's experiment.

  2020A 5th Cycle
Date: 2020-08-24 (Mon)
User operation of 2020A 5th cycle at BL26B1 & B2 will start in middle of October.

  BL26B2 sample changer
Date: 2019-04-02 (Tue)
Sample changer SPACE has been upgraded to have two sample holders for faster sample exchange.
By this, we have finished the support for SPACE screw pins.
Instead, mail-in data collection using D-Cha is available with Hampton-typ pins in the Uni-Pucks.
At BL26B1, screw type pins are still available to use.

  BL26 beam property
Date: 2018-10-17 (Wed)
Asymmetric monochromator crystals have been implemented.
The full photon flux at sample at 1A wavelength has increased three times at maximum (depends on the wavalength).
The available wavelength is limited from 0.9 to 1.9A

  BL26B2 area detector
Date: 2018-03-01 (Thu)
CCD area detector MX225HS will be temporarily replaced to MX225,
until April 11th. After 12th, MX225HS is scheduled to be installed again.

  BL26B2 Area detector
Date: 2017-10-30 (Mon)
CCD area detector of BL26B2 has been replaced to MX225HS.

  BL26B2 Area detector (correction)
Date: 2017-10-10 (Tue)
Because of power unit failure of MX225HS system, the MX225 is continuously used for users' operation at BL26B2 until the system will be fixed.

  BL26B2 Area detector
Date: 2017-09-06 (Wed)
CCD area detector will be temporarily replaced to MX225,
until October 11th. After 12th, MX225HS is scheduled to be installed again.

  BL26B2 MX225HS installed
Date: 2017-04-21 (Fri)
Area detector at BL26B2 has been replaced to MX225HS.

  BL26B2 Area detector
Date: 2017-03-15 (Wed)
CCD area detector is temporarily replaced to MX225.
MX225HS is scheduled to be installed again middle of April.

  BL26B1 area detector
Date: 2016-12-08 (Thu)
At BL26B1, EIGER4M is available, and currently in operation.

For detailed specifications, please refere to web site.

https://www.dectris.com/EIGER_X_Detectors.html#main_head_navigation


  BL26B2 Area detector
Date: 2016-10-25 (Tue)
CCD area detector is temporarily replaced to MX225.
MX225HS is scheduled to be installed again on Nov. 7th.

  Area detector at BL26B2
Date: 2016-09-28 (Wed)
CCD area detector has been replaced to MX225HS.
Faster and higher efficiency, and also a shutterless measurement is supported (local use only).
Specifications;
product: MX225HS (225 x 225 mm aperture)
pixel dimension: 2880 x 2880
pixel size: 0.7812 x 0.7812 mm
readout time: 2 sec
Shutterless: available with 1 msec dead time
Sensitivity (gain): 8e- / 12 keV photon
Frame rate: 10, 30, 90 Hz for 2x2, 4x4, 8x8 binning modes

  BL26B1 detector
Date: 2016-03-25 (Fri)
Until May 17th, only the MX225HE CCD detector is available. (R-AXIS is not installed).

  BL26B2 end station
Date: 2015-09-24 (Thu)
Goniometer was replaced with air-bearing system (moved from B1)

Coaxial camera with zoom options is available.

  BL26B1 endstation
Date: 2015-09-24 (Thu)
During summer shutdown, followings are changed;

1)Beam size is controlled by a pinhole unit.
2)Goniometer was replaced by mechanical goniometer (moved from B2)

Currently, the ccd area detector MX225HE is available.

  Upgrade of SPACE at BL26B2
Date: 2015-04-08 (Wed)
Sample storage of SPACE was enlarged as follows by hardware upgrade same as BL26B1;
Past: up to 2 for both SPACE tray and Uni-Puck.
Present: up to 6 and 8 for each.

  Detector at BL26B1
Date: 2015-04-08 (Wed)
Saturn A200 area detector is out of order and need a repair.
Temporarily MX225HE, Rayonix is installed on the R-AXIS stage.

Please note that users planning to use R-AXIS need to ask beamline staff beforehand.